Now you can look at Sprint Planning Sheet: If you click on any Task (or Feature) anywhere you will get classic Task Information in which you can assign Resource or whatever you might consider that you must put. If you want to put first 3 Features in Sprint #1, and another 4 in Sprint # 2, just Drag and drop them there:
Another thing that is missing here):īy the book, Product Backlog should contain Features, and in the Sprint Backlog should be this Features and Task needed to be done to make this Feature. Now you have to define Tasks in a Product Backlog (called – No Sprint, and it can’t be renamed. This is not a perfect solution in MS Project! My first complaint is, that I will like to have possibility to define the length of my Sprints and a number of them. Sprint 6 is still here, and it will be finished at, even the Custom date is, and you can not get rid of this sprint. Now, if you change duration for Sprint 4 and 5 you will get: Now, if you want 5 Sprints instead of 3, you should customize Custom date to the Īs you can see, three more Sprints are generated, and each has 2 weeks duration (by default).
Sprint Backlog is board in which Team put features from Product Backlog (what they think that can be done in that Specific Sprint). Product Backlog is dynamic board in which Product owner can put any feature that he or she wants, whenever he or she wants. As I promised, today I will cover Scrum with MS PROJECT 2016! But, first of all what do we need form Scrum (I will talk what we need – by the book)? We need: Product Backlog and Sprint Backlog.